Knowledge Base

Building Guides & Resources

Comprehensive articles to help you understand the timber frame construction process, materials, and long-term value.

How to Plan a Custom Timber Home

A planning sequence from plot checks and the household brief to a coordinated design, agreed scope and documented handover.

Start by separating wishes from verified constraints. Record the intended use, space needs and budget, then clarify plot access, ground conditions, services and local permission requirements. A suitable layout balances daylight, privacy and summer shading rather than maximizing solar gain without limits. Before fabrication is released, the design team must coordinate the structure, envelope, openings and service routes. Three-dimensional models can assist coordination, but neither their use nor a particular delivery method should be assumed without agreement. Compare offers against the same design revision and document exclusions and responsibilities. Prefabrication can move work off site; actual assembly time, waste and project duration still depend on the agreed system, logistics and execution. The detailed guides below provide separate checklists for each decision.

Understanding Thermal Efficiency in Timber

How the complete envelope, junctions, ventilation and heating design determine a timber home's energy performance.

The thermal properties of timber are only one input to the building design. Compare complete wall, roof and floor assemblies, including insulation, structural members, windows and junctions, rather than isolated materials. Prefabrication does not automatically eliminate thermal bridges or air leakage: both need coordinated details and suitable verification. Airtightness limits unintended air movement, while a ventilation concept addresses fresh air and moisture; the term breathable is not a substitute for either assessment. Winter heat demand and summer overheating require separate consideration. Request project-specific calculations, documented assumptions and the agreed inspection or measurement scope. Actual energy use also depends on climate, occupancy and operation. No general energy-saving percentage or guaranteed comfort level follows from a timber frame alone.

Detailed planning guide library

The detailed library is organized into four connected clusters: plot and spatial planning, building physics, energy and use, and budget and delivery.

A useful sequence is to establish plot constraints first, coordinate the envelope and services next, and only then compare scope, delivery and handover documents.

Ready to take the next step?

Apply this knowledge to your project using the configurator or discuss your open planning questions with us.

Frequently asked questions

Clear answers for planning your timber-home project.

What do the planning guides cover?

They explain decisions around plots, permissions, budgets, construction scope, timber assemblies, comfort, energy and handover.

Do the guides replace local specialists?

No. They help frame questions; qualified local planners must apply current rules and verify the project.

What is a useful next step?

Choose the guide matching your current decision, record its checklist, and bring unresolved project-specific points to the responsible specialist.